Skip to main content
The score is calculated every night at 21:00 UTC, by the fixed formulas below. Today Beacon works out one current score for the whole company; a kept score for each forecast period starts with the monthly lock. While a dimension can’t be read, the score is provisional and names what is left out: financial integrity is left out until an accounting tool is connected.The score, its band, each dimension’s score and the level are shown on the Forecast confidence page in Beacon, and the score beside the Revenue forecast. Each night’s score is also kept in the Forecast confidence module table. The level does not yet change what Beacon does by itself: a person confirms every action on a forecast. See the Forecast confidence module for what runs today.

What it is

Forecast confidence is a 0-100 measure of how much weight a forecast period carries, where higher means more. It is produced once per forecast period — not per account, not per segment — and its main job is to decide what Beacon is allowed to do without a person. It is calculated, like every other published figure. Each reading becomes a 0–100 piece by a stated rule, the pieces combine into the six dimensions, and the dimensions into the score, band and level — all by fixed formulas in the data layer, recorded with their inputs so any score can be reconstructed. Beacon’s AI explains the score, looks into a fall and proposes weight changes for approval. It never overwrites a forecast, never changes a figure, and cannot touch a sealed one.

How it is calculated

Six dimensions are scored and combined at fixed weights. Data quality is the largest single lever: system confidence is 0.60 of it. A connected system falling below 85 pulls the whole index down. A dimension whose source is not connected is left out, and the dimensions that are in share its weight. The period is marked as partial coverage and the missing dimensions are named. A gap is declared, never scored as bad news. Data quality is the exception: without it there is no score, and every forecast action waits for a person.

What it governs

The score sets what Beacon’s agents may do, directly and without a separate setting. The bottom step is unconditional. No instruction, no override and no stated urgency lifts it. Today the level is shown with the score but isn’t acted on yet: whatever the score, a person confirms every action on a forecast.

Where it comes from

How fresh it is

Recalculated every night at 21:00 UTC. A drop of five points or more inside twenty-four hours is designed to open an anomaly review rather than pass unremarked; that alert isn’t sent yet. Every score is written with its inputs, the state of each source, and the version of the formulas that produced it.

Currency and rounding

Neither applies. The index holds no money value; it reads revenue only as an anomaly signal.

What changes it

A connected system’s confidence falling. Deal velocity moving more than a quarter against its benchmark. Probability drifting across the pipeline. More than a fifth of renewal revenue becoming unstable. A usage drop in the largest accounts. A recurring-revenue anomaly against run rate. Concentration also weights it: a heavily enterprise book raises how much pipeline stability counts, and a heavy renewal quarter raises how much renewal stability counts.

What it is not

  • Not a forecast, and not a probability that the forecast is met. It measures how much of the picture Beacon can see, not what the number will turn out to be.
  • Not data integrity. That measures one record. This measures a period.
  • Not per account or per segment. A forecast period carries one score.
  • Not a control you set. The thresholds are fixed and the bottom of the ladder is not negotiable.