Building your own lifecycle is not yet available. The surface for building one is specified and isn’t part of the first release.
What a lifecycle is made of
A lifecycle is one named thing that binds four parts you already have.
Four more parts are optional and off unless you switch them on:
- A link into the forecast
- A forward-looking read
- A control loop that drafts a corrective for a person to approve
- A reporting cadence
Which objects fit
Your object has to arrive at a countable grain. Requisitions, employees, contracts and projects are individual records, and they fit. Raw event streams don’t fit. Product telemetry, clickstream and commit history arrive in volumes that don’t belong in the layer Beacon calculates over. Beacon admits them only as a summarised roll-up at a stated grain, such as usage per account per month, or adoption per feature per cohort per month. If your lifecycle’s object can’t be expressed that way, it doesn’t fit this runtime. Beacon says so, rather than accepting it and degrading quietly.Limits
- A lifecycle never redefines a Beacon figure. Where its score could be confused with a published figure, the published one is authoritative and labelled as such.
- A forward-looking read is a proposal, not a stored number. Beacon puts it to a person, who accepts it or doesn’t. It never becomes a value other figures read.
- A lifecycle may not claim causation. A read that shows two things moving together says so, and is never presented as one causing the other.
- A lifecycle stops when a source stops. It states which connections it needs. If one is missing, the affected stages drop into a named degraded mode instead of being calculated from what’s left.
- Writing back into your tools is off by default and switched on per lifecycle. Inside Beacon, everything a lifecycle produces is visible from the start.
Related
How a customer moves through Beacon
The two rails Beacon ships.
Connect your tools
What a new source involves.
Boundaries
What Beacon will never do with your systems.